Roofs, Water and Trusses

May 4th, 2009

In spite of the torrential rains, construction is still moving along! Roofs over Kids Building and Adult Building are now being installed. The second floor of Adult building will be poured by the end of this week, and 94 foot trusses were hung on April 29th on the Student Building auditorium. Fireproofing of the Kids Building has now begun and parking places opposite the softball field were poured this week.

It’s been a great week for construction. Thank you so much for your continued prayer and support for this campaign. We will be able to use these buildings as a tool to reach our community and tell them about Jesus. As always, to God be the glory for what He is doing.

Author Impact
Posted Monday, May 4th, 2009 at 7:46 am
Category Adult Buildling, Children's Building, Student Building.